Skip to content

Cloud & Security

Cloud & Azure

Migration, AVD and cloud build

Discuss this serviceMSP partners & direct clients

Cloud projects fail in predictable ways: sizing based on optimism, a migration cutover with no rollback, a landing zone that ignores identity and networking until it is too late to change them cheaply.

Vilindor delivers cloud work as engineering, not as a licence resale exercise. We assess what you have, design what you need, migrate in waves with verification at each step, and hand over infrastructure that is documented and supportable.

Cost control is designed in from the start. Right-sizing, reservation planning and auto-shutdown policies are part of the build, because a migration that doubles the run cost is not a success.

What is included

  • Cloud readiness assessment and dependency mapping
  • Azure landing zone design with identity, network and governance
  • Server and workload migration with wave planning and rollback
  • Azure Virtual Desktop design, deployment and image management
  • Hybrid identity — Entra ID Connect, federation and SSO
  • Infrastructure-as-code deployment for repeatability
  • Cost optimisation, right-sizing and reservation planning
  • Post-migration hypercare before transition to managed operations

What changes once we run it

01

Migrations that hold

Wave-based cutover with verification and rollback at each step means go-live weekend stops being a gamble.

02

Predictable run cost

Right-sizing and reservation planning built into the design prevent the bill shock that follows naive lift-and-shift.

03

Documented and supportable

You receive as-built documentation and IaC templates, so the environment can be maintained by anyone competent.

How onboarding actually runs

  1. 01

    Assess

    We inventory workloads, map dependencies and model target-state cost before committing to a design.

  2. 02

    Design

    Landing zone, identity, network topology and security controls are designed and signed off up front.

  3. 03

    Migrate

    Workloads move in waves, each with a test plan, a verification step and a documented rollback.

  4. 04

    Optimise

    Hypercare, cost tuning and handover into ongoing managed operations complete the engagement.

Questions we get asked

Talk to us about cloud & azure

Thirty minutes, no deck. We will tell you what we would do first and roughly what it costs.